SONOFF SWV Zigbee Smart Water Valve IP55 Automatic Irrigation Easy Install Remote Control Time Schedule via eWeLink Alexa Google

Description

SPECIFICATIONS

Battery Included: no

Brand Name: SONOFF

Casing materials: PC+ABS

Certification: CE

Color: Black

Communication method: Zigbee

Dimension: 152x100x46mm

Does It Includes Wireless Communication: Yes

High-concerned chemical: None

Inbox adaptor: No

Origin: Mainland China

Power Source: AC&DC,Ac

Rating: 6V(4*1.5V AA)

Thread Standard: BSP, NH

Watering temperature: 5°C~40°C

Waterproof: IP55

Wireless Communication: ZIGBEE

Wireless connection: Zigbee 3.0

Working humidity: 5%-95%RH, non-condensing

Working pressure: 0.06-0.8MPa

Working temperature: 5°C~60°C

SONOFF SWV Zigbee Smart Water Valve IP55 Automatic Irrigation Easy Install Remote Control Time Schedule via eWeLink Alexa Google

With SONOFF Zigbee Smart Water Valve, you can automate and control your watering system with ease. It is easy and quick to install, simply connect the Zigbee Smart Water Valve between the faucet and the hose to quickly upgrade your irrigation system in just three minutes, automatically watering your lawn, garden, vegetable patch, and more. Open the eWeLink app, tap the button, and you can start today's irrigation immediately. Set a smart scene for the Zigbee Smart Water Valve to irrigate automatically in the early morning, making your life easier.

The Zigbee Smart Water Valve features schedule and capacity modes, supporting single and cyclic irrigation. Say goodbye to forgotten watering and wasted water sessions, ensuring optimal hydration for your home plants or crops. Whether you're at home or away, our smart water valve provides the perfect amount of water, keeping your plants healthy and vibrant.

The Zigbee Smart Water Valve's battery can be used continuously for 20 months, covering two irrigation cycles(Once a day, for one hour each time). If there is a water shortage during irrigation, the app will immediately send a notification. Support checking up to 180 days of water usage and duration through the app. Understand daily, weekly, or monthly data to better control irrigation amounts and save more on water bills. You can use multiple Zigbee Smart Water Valves to work together, setting different irrigation modes for various areas of your home, and creating a personalized smart irrigation system.

SONOFF Zigbee Smart Water Valve is compatible with Zigbee hubs supporting Zigbee 3.0, including SONOFF iHost, SONOFF NSPanel Pro, ZB Bridge Pro, ZBDongle-P, ZBDongle-E, Echo Plus 2nd...
*NSPanel Pro and iHost will support Zigbee water valve in July.
The Zigbee Smart Water Valve supports voice control through Alexa and Google Home. A simple voice command can close the water valve when you think it's about to rain outside. The Zigbee Smart Water Valve can integrate into open-source platforms via ZBDongle-P or ZBDongle-E to perform automatic irrigation functions.

Let's discover the future of lawn care and plant watering with the SONOFF Zigbee smart water valve!

Easy Installation, Smart Irrigation

Simply connect the Zigbee Smart Water Valve between the faucet and the hose to quickly upgrade your irrigation system in just three minutes, automatically watering your lawn, garden, vegetable patch, and more.

Customize Suitable Irrigation Plans

The Zigbee Smart Water Valve features schedule mode and capacity mode, supporting both single and cyclic irrigation. Allow you to provide more targeted care for your home plants or crops.

Just a Touch to Irrigation

Busy with other tasks or traveling and unable to tend to your lawn in the morning? Open the eWeLink app, tap a button, and start today’s irrigation immediately.

Effortless Automation Timed Irrigation

Don’t want to wake up early to irrigate on weekends and just want to sleep in? Set a smart scene for the Zigbee Smart Water Valve to irrigate automatically in the early morning, making your life easier.

A Simple Voice to Control

Supports voice control through Alexa and Google Home. A simple voice command can close the water valve when you think it’s about to rain outside.

Peace of Mind from Every Way

Working Together for Smart Irrigation

You can use multiple Zigbee Smart Water Valves to work together, setting different irrigation modes for various areas of your home, and creating a personalized smart irrigation system.

Track Water Data for 180 Days

Support checking up to 180 days of water usage and duration through the app. Understand daily, weekly, or monthly data to better control irrigation amounts and save more on water bills.

Expand Capabilities on Open-Source Platforms

The Zigbee Smart Water Valve supports Zigbee 3.0. Integrate it into open-source platforms via ZBDongle-P or ZBDongle-E to perform automatic irrigation functions.


SONOFF SWV Zigbee Smart Water Valve IP55 Automatic Irrigation Easy Install Remote Control Time Schedule via eWeLink Alexa Google

Product form

SPECIFICATIONSBattery Included: noBrand Name: SONOFFCasing materials: PC+ABSCertification: CEColor: BlackCommunication method: ZigbeeDimension: 152x100x46mmDoes It Includes Wireless Communication: YesHigh-concerned chemical: NoneInbox adaptor:... Read more

Next dispatch: 1–3 business days

$57.78 Including GST

    • Guaranteed secure & safe checkout.

      shop pay
    • No hassle returns, 30 days return
    Shipping & delivery

    In-stock orders are normally dispatched within 1–3 business days. Delivery times vary by destination and carrier. Read our Shipping Policy

    Returns & refunds

    Eligible returns can be requested within 30 days of delivery. Faulty, damaged or incorrect items are handled in line with Australian Consumer Law. Read our Return & Refund Policy

    Description

    SPECIFICATIONS

    Battery Included: no

    Brand Name: SONOFF

    Casing materials: PC+ABS

    Certification: CE

    Color: Black

    Communication method: Zigbee

    Dimension: 152x100x46mm

    Does It Includes Wireless Communication: Yes

    High-concerned chemical: None

    Inbox adaptor: No

    Origin: Mainland China

    Power Source: AC&DC,Ac

    Rating: 6V(4*1.5V AA)

    Thread Standard: BSP, NH

    Watering temperature: 5°C~40°C

    Waterproof: IP55

    Wireless Communication: ZIGBEE

    Wireless connection: Zigbee 3.0

    Working humidity: 5%-95%RH, non-condensing

    Working pressure: 0.06-0.8MPa

    Working temperature: 5°C~60°C

    SONOFF SWV Zigbee Smart Water Valve IP55 Automatic Irrigation Easy Install Remote Control Time Schedule via eWeLink Alexa Google

    With SONOFF Zigbee Smart Water Valve, you can automate and control your watering system with ease. It is easy and quick to install, simply connect the Zigbee Smart Water Valve between the faucet and the hose to quickly upgrade your irrigation system in just three minutes, automatically watering your lawn, garden, vegetable patch, and more. Open the eWeLink app, tap the button, and you can start today's irrigation immediately. Set a smart scene for the Zigbee Smart Water Valve to irrigate automatically in the early morning, making your life easier.

    The Zigbee Smart Water Valve features schedule and capacity modes, supporting single and cyclic irrigation. Say goodbye to forgotten watering and wasted water sessions, ensuring optimal hydration for your home plants or crops. Whether you're at home or away, our smart water valve provides the perfect amount of water, keeping your plants healthy and vibrant.

    The Zigbee Smart Water Valve's battery can be used continuously for 20 months, covering two irrigation cycles(Once a day, for one hour each time). If there is a water shortage during irrigation, the app will immediately send a notification. Support checking up to 180 days of water usage and duration through the app. Understand daily, weekly, or monthly data to better control irrigation amounts and save more on water bills. You can use multiple Zigbee Smart Water Valves to work together, setting different irrigation modes for various areas of your home, and creating a personalized smart irrigation system.

    SONOFF Zigbee Smart Water Valve is compatible with Zigbee hubs supporting Zigbee 3.0, including SONOFF iHost, SONOFF NSPanel Pro, ZB Bridge Pro, ZBDongle-P, ZBDongle-E, Echo Plus 2nd...
    *NSPanel Pro and iHost will support Zigbee water valve in July.
    The Zigbee Smart Water Valve supports voice control through Alexa and Google Home. A simple voice command can close the water valve when you think it's about to rain outside. The Zigbee Smart Water Valve can integrate into open-source platforms via ZBDongle-P or ZBDongle-E to perform automatic irrigation functions.

    Let's discover the future of lawn care and plant watering with the SONOFF Zigbee smart water valve!

    Easy Installation, Smart Irrigation

    Simply connect the Zigbee Smart Water Valve between the faucet and the hose to quickly upgrade your irrigation system in just three minutes, automatically watering your lawn, garden, vegetable patch, and more.

    Customize Suitable Irrigation Plans

    The Zigbee Smart Water Valve features schedule mode and capacity mode, supporting both single and cyclic irrigation. Allow you to provide more targeted care for your home plants or crops.

    Just a Touch to Irrigation

    Busy with other tasks or traveling and unable to tend to your lawn in the morning? Open the eWeLink app, tap a button, and start today’s irrigation immediately.

    Effortless Automation Timed Irrigation

    Don’t want to wake up early to irrigate on weekends and just want to sleep in? Set a smart scene for the Zigbee Smart Water Valve to irrigate automatically in the early morning, making your life easier.

    A Simple Voice to Control

    Supports voice control through Alexa and Google Home. A simple voice command can close the water valve when you think it’s about to rain outside.

    Peace of Mind from Every Way

    Working Together for Smart Irrigation

    You can use multiple Zigbee Smart Water Valves to work together, setting different irrigation modes for various areas of your home, and creating a personalized smart irrigation system.

    Track Water Data for 180 Days

    Support checking up to 180 days of water usage and duration through the app. Understand daily, weekly, or monthly data to better control irrigation amounts and save more on water bills.

    Expand Capabilities on Open-Source Platforms

    The Zigbee Smart Water Valve supports Zigbee 3.0. Integrate it into open-source platforms via ZBDongle-P or ZBDongle-E to perform automatic irrigation functions.


    Top 10 best selling products

    You may also like these products. These products are rated as 'top 10 best of the best' by our clients

    Returns & Delivery

    When will my order be dispatched?

    In-stock orders are normally dispatched within 1–3 business days. Delivery times vary by destination and carrier. Tracking details will be emailed after your order is dispatched.

    Can I return my product?

    You can request a return within 30 days of receiving your order. Items should be in their original, resalable condition unless they are faulty or damaged.

    What can I do if my item (or part of it) is damaged?

    Contact our Australian support team with your order number and photos of the damage. We will review the issue and help arrange the appropriate replacement, return or refund.

    Recently viewed products